Arrives By
A chip opening, a rail drawing across it, and a dot running to the far end before the date lands.
- Duration
- 3s
- Frame
- 640 × 360
- Export
- MP4, GIF, MOV (alpha)
- Resolution
- Up to 4K
A chip opening, a rail drawing across it, and a dot running to the far end before the date lands.
The delivery answer for the question every product post gets in the comments. The dot completing its run is what makes the date read as arrival rather than as dispatch, so put the date the customer receives it, not the day you post it. Keep the label to a short day-and-date; the chip is sized for about twenty characters and grows rightward.
Put the date the customer receives it, not the day you post: Arrives Tue, Mar 4. The chip is sized for about twenty characters and grows rightward, so keep the label to a short day and date. The dot colour is the runner on the rail.
Arrives By is built at 640 × 360, a 16:9 landscape frame, the shape of a YouTube video, a stream layout and most editing timelines, and runs 3 seconds at 30 frames per second. It arrives in 1.3 seconds, holds for 0.9 and clears in 0.9, so cue it a beat before the moment it labels. Export it as an MP4 for a timeline or a feed, a GIF where video will not embed, or a MOV with an alpha channel to lay it over footage with nothing behind it. Renders go up to 4K, and the free plan exports at 720p with a watermark.
Because the dot completing its run is what makes the date read as arrival rather than dispatch. The chip opens, the rail draws, the dot arrives, then the date lands.
Yes, if it is short. Arrives in 2 to 4 days fits. Anything longer pushes the chip past its width.